- Replace 100A, 240V, 3 Pole fused disconnect c/w new fuses - Replace feeder from load side of disconnect to new controller (Copper Only) - Replace (2) light fixtures (machine room and elevator pit) with 4' strip lights - Install (1) new 15A GFCI receptacle in machine room - Replace (1) 15A receptacle with GFCI (Elevator Pit) - Install cat5e cabling from electrical room to elevator machine room, connections by others - Install #6 bond wire from main system ground in electrical room to elevator machine room - Install 120V baseboard heater c/w built-in stat — Fernwood | Lead Blueprint