Skip to main content

Loading...

Upgrade the existing electrical service to 200 amps with an overhead supply. Supply and install a new service mast, meter base, grounding plate, electrical panel, and circuit breakers Gym Supply and install a new 15 A circuit serving two receptacles, one at the TV location and one additional location. Reconnect the existing center light to this circuit and install a separate switch so the light can be controlled independently. Supply and install a dedicated 20 A circuit and receptacle for the treadmill. Workshop Supply and install two receptacles in a two-gang box on the pillar for the saw an… — Gonzales | Lead Blueprint