Skip to main content

Loading...

Extraction of the existing tension deficient post-tensioned cables within the tower¿s main (2nd), 4th, and roof level slabs; targeted replacement of tension deficient post-tensioned cables at the tower¿s main (2nd), 4th, and roof level slabs including replacing the post-tensioned anchors (includes removal and replacement of masonry facade to facilitate access for this work); and replace concrete at repair areas and coat slab edge to protect against future moisture ingress. — M2H | Lead Blueprint