Skip to main content

Loading...

Replace rear loading dock concrete ramp/slab, including demolition, new reinforcing steel,waterproofing, one new drain, new concrete and asphalt tie-ins. Repair/replace generator-roomconcrete slab up to 110 sq. ft., retaining/cleaning existing rebar and adding reinforcement asrequired. Provide shoring, formwork and protection. Structural slab work per AJW drawing S1,project 26-16106.2, revision R0, issued for permit September 17, 2026. — M1P | Lead Blueprint