Skip to main content

Loading...

Replacement of passenger elevator between eastbound platform and concourse level of the Station. Minor concrete work at elevator lintels and jambs repairs to damaged walls, Minor concrete repairs within pit, re-level pit to provide slope to drain, replacement of CCTV camera and connection of elevator to FA system for recall, including lobby FAIDs. Replacement of existing HVAC system. — M5R | Lead Blueprint