Skip to main content

Loading...

REVISION 1: Extension of basement by underpinning which was proposed in original permit is removed from this revised proposal. Basement area is now similar to existing floor plan. Proposed washroom as in original permit is removed from basement plan. Basement entrance stair proposed at the rear side of existing garage. 2. 1st floor plan: 2 walls removed, washer dryer relocated, interior stair size revised, post & LVL added.3. Window wells removed from site plan, floor plan & elevations since underpinning proposal is removed.DWELLING CONVERSION TO DUPLEX EXTENSION OF BASEMENT BY UNDERPINNING T… — M1M | Lead Blueprint