Skip to main content

Loading...

REV 01: REDUCED SCOPE FROM ISSUED PERMIT: REMOVE INTERIOR STRUCTURAL WALL ON THE GROUND FLOOR; ADD NEW BEAM AND COLUMNS; ADD NEW COLUMNS AND FOOTINGS IN THE BASEMENT; RE-ARRANGE KITCHEN AND ALTER NON BEARING WALLS IN THE LIVING-DINGING ROOMS. PREVIOUS ALTERATION OF EXTERIOR WALLS WITH INSULATION HAS BEEN DELETED; REVISIONS TO THE BASEMENT STAIR AND UTILITY ROOM PARTITIONS HAS BEEN DELETED. REAR MASONRY BEARING WALL REMOVAL IS DELETED. — M6G | Lead Blueprint