Skip to main content

Loading...

REV01: Proposal for shear walls to replace steel moment frame. Two windows (WD15.2 and WD15.3) added to South Elevation. One single skylight opening to replace 3 smaller openings in Roof. Single Door (D05.2), added to basement between existing and new addition.Proposal for multiple projects including a two-storey rear addition, basement walk-out, second-floor balcony and third-floor terrace. See also 26-140262 ZAP 00 ZR — M4E | Lead Blueprint