Revision to the following areas - P3 shaft wall added to drawing A010 attached..P2 wall on the north side of the Mechanical Room has been replaced with P3 shaft wall, see drawing A201, attached Details added for the rating of the existing steel beams above the Mechanical room with cementitious fire spray, refer to drawing A602, attached.Addition of entry vestibule. Refer to schedule drawing A011-2, vestibule drawings A012-2, and plans on A201Proposed interior alteration of an existing space into a reception area. — M6K | Lead Blueprint