Skip to main content

Loading...

REV 01: Adding a washroom to the basement, relocating the sump pump and tankless water heater below the staircase, reducing the sonotube foundation diameter from 14" to 10", modifying the second-floor washroom layout, revising the structural lintel to reflect the egress window, changing the lintel from wood to steel on Drawing 4/S1.0, and revising Drawing 1/S1.0 to show a 6" thick CMU wall.Proposal to convert existing detached SFD to a triplex. — M1K | Lead Blueprint