Skip to main content

Loading...

Revision 01: to include construction of a new manhole at property line on existing sanitary service and adjustments to the fire service for water meter and backflow. The construction of new storm sewer infrastructure within the site and the associated regrading required to alleviate the drainage issues that are present in the existing conditions. The imperviousness of the site is not changing under proposed conditions. No new construction proposed. — M8Z | Lead Blueprint