Skip to main content

Loading...

Rev 02 - revision Basement : Adding a access door to sump pump room (Refer to 1/A-5)- Ground floor: Unit 3 stair location revised as per site conditions (Refer to 2/A-5)- First Floor:Unit 3 Bedroom, exterior wall retained , new window to replace existing window (Refer to 1/A-6)Rev 01 - Amendments to the layout.Proposal for two storey front and rear addition, new front proch, new basement walkout, demolition of exisiting garage. Addition of 3 units to convert to 4 unit houseplex. — M6E | Lead Blueprint