Skip to main content

Loading...

REV: Update the approved site plan to reflect the actual as-built building locationand side yard setbacks, as confirmed by the as-built survey.Proposal to construct a two-storey laneway suite with basement.(FOR MAIN HOUSE REFER TO 25-163437 BLD 00 NH) — M6M | Lead Blueprint