Skip to main content

Loading...

REV01: revision to HVACHVAC - The scope of work includes both interior and exterior alterations, specifically modifying the third-floor suites (which are currently vacant due to the TFC concerns) to provide two means of egress. Additionally, an exterior stair is proposed on the south side of the building to facilitate safe and compliant exiting from each suite providing two means of egress. — M6R | Lead Blueprint