Skip to main content

Loading...

Revision No.3: 1. At Basement, units are swapped such as previous unit-1 is now unit-2 and vice versa. Sleeping area, living and stove & fridge added as commented in PERMIT of Rev#2 (24 201222 BLD 02 NH); 2. The rear deck size is reduced; 3. Porch canopy proposed. 4. Window size increased at north elevation and within limit.Revison 02: 1. Roof plan/ 3rd floor: GFA increased; total building height remain unchanged and required front & rear setback maintained. 2. Basement: prayer room, elevator & heated closet proposed. 3. Ground floor: powder room converted to full washroom, kitchen door & wal… — M1M | Lead Blueprint