Skip to main content

Loading...

Rev02 updated: omitting the driveway change for this revision,relocated the pool equipment into the large walkout area,covered canopy, sliding door changes to width to ground and second floorREV 02: Proposed revision to driveway width, pool equipment on west sliding, covered canopy, sliding door changes to width to ground and second floorRev 01: revise foundation Proposed new three storey dwelling — M5N | Lead Blueprint