Skip to main content

Loading...

REV02: Revision as bubbled.Revision 1: Remove existing load bearing wall. Replace with beams and column in basement.Proposal to convert the existing basement to a second unit and enclose the projected area at the rear and new roof above existing balcony — M1E | Lead Blueprint