Skip to main content

Loading...

REV 03: Revision to permit due to change of height to sprinkler layout in the Truck Tunnel. REV 02 - Revision to sprinkler drawings - Revision to permit due to elevation change to sprinkler layout in the Truck Tunnel. REV 01 - Revision descriped in application formThe scope of work includes the removal and isolation of existing mechanical, electrical, IT and security infrastructure in the lower concourse area, in the concourse area, in the truck tunnel, and at platform level as part of the Union Station Enhancement Project. (Fire Alarm demolition/protection) — M5J | Lead Blueprint