Skip to main content

Loading...

Rev 03 - To provide minimum unobstructed glass area as per 2012 OBC Table 9.7.2.3.(1) for suite 305 master bedroom and suite 306 bedroom 2 because of as built site conditions.REV 02: Stair F in Building C extended to mechanical penthouse level in order to provide second means of egress as per 2012 OBC 3.3.1.3.(6) requirements.Rev 01 - Proposal to change some wall assemblies above grade. Change in layout.Proposal for a 12 Storey tower (Building C )This is a part of Phase 6 of Davenport Village which including 36 Storey Tower (Building A)+29 Storey Tower (Building B) on a 7 Storey Podium, 12 St… — M6H | Lead Blueprint