Skip to main content

Loading...

Alteration to an 2 storey SFD. Work includes structural modifications to the basement and main floor, including the removal of the secondary staircase, installation of new flush beams and two structural beams, reconfiguration of the kitchen, reduction size of the bay window, and reconfiguration of the primary ensuite and laundry room. No gross floor area will be added. — Ward 4 | Lead Blueprint