Skip to main content

Loading...

REV 02: 1. The second floor addition is removed 2. The basement walkout is removed 3. The underpinning scope is reduced to a small portion of the basement adjacent to the garage. See drawing A2.1 4. The interior layout of the basement is revised 5. The interior layout of bedrooms and bathrooms on the second floor is revised 6. Revised Structural drawings are also attached with this applicationREVISION 01 - basement underpinning, basement walk out and a revised second floor layout To construct a two-storey front addition and a partial second storey addition. A previous Committee of Adjustment… — M6S | Lead Blueprint