Skip to main content

Loading...

Interior alterations to the basement and first floor of a mixed-use building, including the addition of a rear exterior stairs providing access to the basement and the ground floor. The basement is to be converted into a massage therapy establishment. The first floor contains an existing barbershop, and the second floor contains an existing residential unit. — M9N | Lead Blueprint