Skip to main content

Loading...

REV 01: Supply and install a new sprinkler system on the third floor and connect to the existing sprinkler riser. Supply and install one new fire hose cabinet with 100'-0" hose. Replace exiting fire hoses with new 100'-0" hose where shown. OBC Class D. Revised to meet site condition and CC0-005R1Construct interior alterations to security office (Union Station) — M5J | Lead Blueprint