Skip to main content

Loading...

To construct interior alterations (Fill the void under the basement floor as the enginer report required , NOT to be used as an additional Dwelling) and to construct exterior alterations (Fill the dirt beside the house fundation as in the engineer's report requirements ). — EDGEMONT | Lead Blueprint